Each one in plain English, with the numbers worked through for a shareholder.
23 Nov 2021drilling progress report▲ GoodMajor
Wireline logs over Rafael 1 confirmed a 165m gross gas column in a dolomite reservoir section resembling Ungani's productive interval; the well was being completed with an uncased 'barefoot' section below casing to maximise flow potential ahead of testing.
Rafael 1 reached 4,141m total depth with good-excellent wet-gas shows (rich in LPG/condensate) over a 120m interval below the previously reported gas influx zone - drilling parameters suggest a real conventional reservoir; logging and a flow-test completion follow.
Rafael 1 hit gas-charged vugular dolomite while drilling ahead in 8½-inch hole to 3,872m, prompting Buru to run casing before continuing into 6-inch hole - encouraging wireline log and pressure data ahead of a planned flow test on what would become the Rafael gas/condensate discovery.
Rafael 1 reached 3,872m, penetrating the top of its main objective carbonate section with encouraging light-oil-to-wet-gas mudgas indications across several zones, though significance awaited wireline logging and any warranted flow test.
Rafael 1 reached its 3,500m casing point (9⅝-inch casing about to run) after slow drilling through hard Anderson Formation sandstones - encouragingly, the basal Anderson section showed elevated mud-gas readings up to 4%, about 10x background.
2H Resources (already flagged as a Buru energy-transition business by mid-2021) had been granted over 29,000 sq km of South Australian permits on trend with legacy natural hydrogen discoveries, with on-ground prospecting to follow.
A ~74,000-bbl Ungani lifting to BP (~A$3.7M to Buru on a strong Brent price) came as the field held a stable ~800 bopd; Buru confirmed Ungani 8, a horizontal well targeting an undrained fault block near Ungani 6H, for after Rafael 1 finishes drilling.
Swab testing confirmed good reservoir quality across all four porous zones logged in Currajong 1, but recovered no oil - pressure data showed the zones are water-bearing, closing out Buru's first well of the 2021 Canning Basin program as non-commercial despite a real westward extension of the Ungani-style dolomite play; the well was suspended pending further review.
Buru Energy reported $32.9M cash on hand at the end of the quarter ended 2021-09-30, having used $2.4M in operating cash flow that quarter. Against $2.4M in quarterly cash outgoings (operating costs plus exploration spend), that implied roughly 14.0 quarters of funding on hand.
Rafael 1 drilled ahead to 2,772m (slower than planned due to hard-formation bit trips) toward its casing point, while Currajong 1's four test zones were perforated and rigged up for testing due to start shortly.
Buru called a shareholder meeting to formally ratify the shares it had already issued under its April 2021 placement - a routine governance step required under ASX rules that cap how many shares a company can issue without shareholder approval, not a sign of any problem with the earlier raise.
Rafael 1 drilled ahead toward its casing point with no incidents, while the JV finalised a four-zone Currajong 1 test program expected to start late September.
Rafael 1 spudded at 01:45am on 22 August 2021, targeting 69 million barrels of mean prospective resources on a large structure likened to prolific Devonian carbonate plays in Western Canada, to be followed by the Ungani 8 development well.
Currajong 1 reached 2,340m with oil-saturated zones resembling Praslin 1's reservoir (to be confirmed by a planned cased-hole flow test), and a specialised hydrogen mudgas detector found up to 6% hydrogen over a 6m interval - an early, real signal of natural hydrogen in the Canning Basin.
Buru issued an investor presentation, 'Driving the Integrated Energy Transition', positioning the company's core oil and gas business alongside its emerging energy-transition ventures.
Following Currajong 1's 1 July spud, intermediate casing was set at 715m and drilling resumed toward a 2,300m total depth, while the 2021 seismic program's start slipped to late July after the survey crew was temporarily lent to another Perth Basin operator.
Currajong 1 spudded at 10:00am on 1 July 2021, a large 3D-seismic-defined structure targeting 28 million barrels of mean prospective resources (Buru/Origin 50/50), to be followed by Rafael 1.
Buru Energy reported $35.2M cash on hand at the end of the quarter ended 2021-06-30, having used $173K in operating cash flow that quarter. Against $173K in quarterly cash outgoings (operating costs plus exploration spend), that implied roughly 203.0 quarters of funding on hand.
A 'Driving the Integrated Energy Transition' deck introduced Buru's new energy-transition portfolio alongside its core oil/gas business: 2H Resources (natural hydrogen), Geovault (CCUS), Battmin (battery minerals), and an integrated gas-and-solar project (REP).
15 June 2021drilling progress report● NeutralMajor
Buru's 2021 Canning Basin exploration campaign kicked off: the Ensign 963 rig is rigging up at Currajong 1 (spud likely after 24 June due to an equipment delay), the Rafael 1 pad is being prepped for the rig's next move, and a seismic crew is expected in late June/early July.
Buru Energy lodged a routine cleansing notice confirming 6,368,750 new shares issued under its Share Purchase Plan at $0.16 (raising $1.02 million) complied with disclosure rules and can trade freely.
9 June 2021capital raising announcement▲ GoodMajor
Buru's Share Purchase Plan closed, raising a further $1.02 million from 133 shareholders at $0.16 a share - completing, together with the earlier $15 million institutional placement, a combined roughly $16 million raise. Executive Chairman Eric Streitberg said Buru was now fully funded for its 2021 Canning Basin program, with the first new exploration well (Currajong) about to spud.