Each one in plain English, with the numbers worked through for a shareholder.
28 Apr 2015quarterly activities report▲ GoodMajor
Buru launched a fully-funded two-rig, five-to-seven-well Canning Basin exploration program using lower-cost drilling techniques, signed Native Title agreements for Ungani (a Kimberley first), and set commercial oil production at Ungani to begin mid-July 2015.
Non-executive director Peter Jones (ARC Energy's founding chairman and a Buru director since 2009) resigned for health reasons, leaving Streitberg, Eve Howell, and Rob Willes on the Board.
The WA Supreme Court ruled against Fitzroy River Corporation's bid for a gross royalty, confirming Buru/Mitsubishi's calculation method (a 2% net-wellhead royalty) and ordering Fitzroy to pay costs - resolving the 2013 dispute in Buru's favour.
The WA Supreme Court dismissed Fitzroy River Corporation's claim over the Canning Basin Royalty Deed, confirming Buru/Mitsubishi's 2%-net-wellhead calculation and ordering Fitzroy to pay costs.
All three Traditional Owner groups (Nyikina Mangala, Karajarri Yanja, and now Yawuru) had executed Native Title Agreements for Ungani, clearing the way for Buru/Mitsubishi to complete their Production Licence application.
The Yawuru People authorised entry into an Indigenous Land Use Agreement for the Ungani Oil Field, the last of the three native title approvals needed for Ungani's Production Licence.
Buru Energy reported $43.6M cash on hand at the end of the quarter ended 2015-03-31, having used $9.9M in operating cash flow that quarter. Against its own $7.0M forecast for next-quarter outflows, that implied roughly 6.2 quarters of funding on hand.
The Nyikina Mangala and Karajarri Yanja People agreed to a Native Title Agreement clearing the way for Ungani's Production Licence applications, with only the Yawuru People's vote still outstanding.
Sunbeam 1 reached 1,200m with no significant hydrocarbons in the targeted Grant Formation channel sands and was suspended, though Buru flagged possible re-entry to test the deeper Emanuel reefal prospect.
Buru replaced the damaged Yulleroo 2 wellhead valve under DMP oversight (confirming full compliance, no incidents) and completed related environmental rehabilitation work with Traditional Owner involvement.
Sunbeam 1 spudded on 25 January 2015 (EP129, Buru 100%), a Year-4 permit commitment well targeting Grant Formation conventional oil reservoirs, following on from the successful Commodore 1 well.
WA's DMP confirmed a minor gas leak at Yulleroo was caused by physical damage to a valve (possibly third-party interference under investigation), refuting protester claims of a significant uncontrolled leak.
Buru's agreement to buy a 50% interest in EP487 from Backreef Oil (originally signed 2012, twice extended) lapsed on 31 December 2014 without the transfer occurring, releasing Buru from the $3.5M purchase price and related litigation costs with no material effect on its tight-gas resource base.
Rey Resources advanced its own conditional deal for 50% of the Derby Block (EP487) after confirming Backreef Oil's separate agreement to sell that same interest to Buru had expired on 31 December 2014 - Buru's Derby Block acquisition attempt had lapsed.
Buru Energy's FY2014 remuneration report disclosed pay for its board of Peter Jones, new directors Eve Howell and Robert Willes (both appointed July 2014), and Executive Chairman Eric Streitberg, led by Streitberg at $1,148,334 (including a termination payment tied to his brief return to an executive role) - Managing Director Kieran Wulff, who had ceased employment in July 2014, is listed only as a former director on $874,163.
Buru Energy reported $59.9M cash on hand at the end of the quarter ended 2014-12-31, having used $6.5M in operating cash flow that quarter. Against its own $19.0M forecast for next-quarter outflows, that implied roughly 3.1 quarters of funding on hand.
Commodore 1 was cored to its 1,600m total depth through the Goldwyer Shale Formation with excellent recovery; despite some oil shows, no producible hydrocarbon zones were found and the well was plugged and abandoned - the last report for Commodore 1.
Fitzroy River Corporation reported that court-ordered mediation in its Canning Basin Royalty Deed case against Buru/Mitsubishi failed to resolve the dispute, with a trial now set for no earlier than 30 March 2015.
Commodore 1 reached its 1,150m sectional total depth in the Lower Grant Formation with no hydrocarbon indications; wireline logs are pending before coring ahead into the deeper Nita Formation objective.
The 224 sq km Jackaroo 3D seismic survey (linking the Yulleroo and Ungani grids and covering the Jackaroo/Praslin prospects) was completed with good-to-excellent data quality and no incidents.
Oil Basins disputed a proposed Rey Resources/Backreef Oil deal for 50% of the Derby Block (EP487), noting Backreef didn't hold that interest and awaiting a WA tribunal ruling on Backreef's standing.
Phase 1 of the Laurel Formation Tight Gas Pilot program finished at the Asgard and Valhalla North wells (site civil works, well conditioning, cement bond logging, and diagnostic mini-fracs) with no operational or environmental incidents, setting up the main 2015 frac program.
Ungani North 1's nitrogen lift established only low fluid inflow, mostly drilling-fluid filtrate rather than genuine reservoir recovery - an inconclusive result that led Buru to suspend the well pending further evaluation and a JV forward plan.