29 Nov 2017regulatory community update● NeutralMajor
Buru, Mitsubishi, and the WA Government agreed to mutually terminate the 2012 Canning Basin State Agreement (subject to a parliamentary ratification act expected in 2018); the underlying permits EP371/391/428/431/436 remain valid on their existing terms through 2023-2024.
New ESPs delivered design-rate fluid (up to 1,800 bopd, managed down to ~1,200 bopd on storage/trucking limits) and a ~55,000-bbl lifting at ~A$75/bbl, while Ungani 4 confirmed a 60m+ oil column ahead of its completion and Ungani 5 (appraising the Ungani 3 oil pool) was set to spud shortly.
Ungani 4 wireline logging failed after the shale section above the reservoir bridged off (extended open-hole time); the well was temporarily suspended and the rig moved to spud Ungani 5 while specialised equipment is sourced - flowline construction proceeds regardless given the well's positive results to date.
Ungani 4 reached 2,249m total depth with oil shows and an oil-water contact consistent with the field; implies a gross oil column over 60m, pending log confirmation - better than Ungani 1ST1's 58m and Ungani 2's 54m.
Buru's investor presentation showed a $0.26 share price (~$112 million market cap) and $25.6 million cash on hand, reflecting continued strength following the 2017 rights issue and start of the Ungani development drilling program.
Ungani's newly-installed electric submersible pumps in Ungani 1ST1 and Ungani 2 came online as designed, lifting test rates as high as 3,000 bopd field-wide (individual wells over 1,600 bopd) even as output was deliberately constrained to 1,250 bopd while transport was recommissioned toward a 1,500 bopd target; an extra perforation lifted Ungani 2's productivity over 50%, and a water-injection test on Ungani 3 came in far better than expected, while Ungani 4 continued drilling toward a mid-November reservoir intersection.
Ungani 4 development well spudded at 19:00hrs on 19 October 2017, an additional drainage point in the Ungani Oilfield intended to verify reservoir continuity and help take field production toward its 3,000 bopd target.
The Ungani 2 ESP workover was completed on time and on budget, adding extra perforations that opened up previously bypassed oil pay; the rig then moved to the Ungani 4 location, with spud expected 19 October 2017.
Fitzroy River Corporation received its first royalty payment from Buru ($36,880, a 2% net royalty) since Ungani drilling resumed in mid-2017 - real confirmation the resumed field was generating income.
Ungani 1ST1's ESP workover completed successfully on time and budget; Ungani 2's workover is underway with an extra 12m of reservoir to be perforated before its own ESP is run.
Ungani 1ST1 and Ungani 2 production wells shut in for a workover campaign: recovering old completion strings to re-complete both with electric submersible pumps (ESPs), after which the rig moves to spud the new Ungani 4 development well.
Buru Energy reported $25.6M cash on hand at the end of the quarter ended 2017-09-30. Against its own $13.6M forecast for next-quarter outflows, that implied roughly 1.9 quarters of funding on hand.
Buru's DDGT1 rig began workovers to fit electric submersible pumps to the existing Ungani 1 and 2 wells (shutting in production for about 18 days), on schedule ahead of the new Ungani 4 development well, expected to spud the week of 16 October 2017.
Buru's investor presentation, issued just after the 2017 rights issue closed, showed the company's position transformed: 432 million shares, a $0.20 share price (~$86 million market cap), and $27 million cash on hand post-raising.
Buru confirmed the rights issue raised a final $13.8 million (including the top-up placement), with new shares allotted and no shortfall shares needed - alongside news of Buru's first oil export lifting from Wyndham and mobilisation of the drilling rig for the newly-funded Ungani development wells, tying the successful capital raise directly to on-the-ground progress.
The rights issue raised $14.5 million in total - well above the original $10.2 million target - once a small top-up placement to sophisticated investors was included, fully funding Buru's Ungani development drilling program with room to spare.
5 Sept 2017regulatory community update● NeutralMajor
Buru noted the WA Government's new fraccing moratorium pending a scientific inquiry, pointing out that a prior 2013-2015 parliamentary inquiry (and several other independent reviews) had already found hydraulic fracturing poses negligible risk if properly regulated.
Buru's rights issue closed substantially oversubscribed, with applications already exceeding the $10.2 million target before final processing - a strong show of shareholder support.
In a letter accompanying the rights issue prospectus, Executive Chairman Eric Streitberg told shareholders the raise was needed to fund two additional Ungani wells, made possible by Buru's recent asset swap with Mitsubishi that gave it full (100%) ownership of the Ungani oil field, and noted the company's two largest shareholders had already committed to take up their full entitlements.
Buru locked in its drilling rig, crew, and Halliburton well services ahead of a planned drilling program while flagging its first Ungani oil-lifting cargo (via Trafigura) was on track for early September 2017 - the build-up behind the Ungani 4 and Ungani 5 wells spudded later that year.
The BPAY payment error affecting some rights-issue applications was resolved by the responsible bank, clearing the way for affected shareholders to complete their payments.