Stockle - the stock oracle

Buru Energy

ASX:BRU
A$0.013Close 7 Oct 2026 · delayed

Past year: ▼ 28%(1.20c – 2.40c AUD)

Market cap
A$17.7m
Shares on issue
1.36bn
In-ground value
A$1.53bn
Risked multiple
under review
Story beats
310 since 2009
Last event
19 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

2 Nov 2011drilling spud▲ GoodMajor

Ungani-2 spudded at 07:00hrs on 2 November 2011, the fourth well of the 2011 Buru-Mitsubishi program, drilled to confirm the extent of the oil accumulation and the oil/water contact already found by Ungani-1ST1 - an early step in proving up what became the Ungani Oilfield.

Value this in the calculator →Discuss in chat

27 Oct 2011drilling progress report▼ Bad

Lawford-1 was logged with no hydrocarbon indications and is being plugged and abandoned; the rig will move to deepen Paradise-1 - the last drilling report for Lawford-1.

Value this in the calculator →Discuss in chat

24 Oct 2011drilling progress report● Neutral

Lawford-1's deepening reached 2,690m in the interpreted Lower Anderson Formation with no distinctive markers yet found and slow drilling encountered.

Value this in the calculator →Discuss in chat

20 Oct 2011drilling progress report● Neutral

Ungani-1ST1 was shut in and the rig released to spud the Ungani-2 appraisal well from the same pad - the last drilling report for Ungani-1ST1.

Value this in the calculator →Discuss in chat

19 Oct 2011drilling progress report▲ GoodMajor

Ungani-1ST1 flowed 1,500 barrels of fluid per day on a small choke at 230psi and was cleaning up well (up to 15% filtrate/formation fluid) before being shut in at 430psi ahead of moving the rig to Ungani-2 - a genuinely encouraging early sign for the eventual Ungani discovery.

Value this in the calculator →Discuss in chat

7 Oct 2011drilling progress report▲ Good

Preliminary LWD interpretation at Ungani-1ST1 indicated a potential ~57m gross (likely oil) hydrocarbon column with an estimated 11.7m net pay in the Upper Laurel dolomite; the plan became to case with a slotted liner and run an immediate cased-hole test given poor hole conditions.

Value this in the calculator →Discuss in chat

6 Oct 2011farm in farm out completion● Neutral

New Standard's joint-venture partner Green Rock Energy completed its farm-in into permit EP417, earning a 15% interest by funding and participating in the deepening of the Lawford #1 well (drilled using Buru's rig under a delegation from New Standard's operatorship) - the drilling also triggered a final $200,000 back-cost payment to New Standard under Green Rock's original 2011 farm-in terms. Buru's own 35% EP417 stake was unaffected.

Value this in the calculator →Discuss in chat

6 Oct 2011drilling progress report▲ Good

Ungani-1ST1's sidetrack reached 2,324m with severe mud losses and good gas/oil shows in the equivalent 2,160-2,210m interval seen in the original wellbore; LWD logging was underway due to hole problems.

Value this in the calculator →Discuss in chat

28 Sept 2011drilling progress report● Neutral

Buru began deepening the suspended Lawford-1 well (EP417, Buru 35% non-operating, operated for New Standard under a delegation agreement), testing both large conventional gas potential and the regional Laurel Formation unconventional play.

Value this in the calculator →Discuss in chat

23 Sept 2011drilling progress report● Neutral

The Ungani-1 JV approved a sidetrack to 2,750m to properly evaluate the hydrocarbon indications seen at 2,160-2,210m, 2,580m and 2,700m; sidetrack operations began.

Value this in the calculator →Discuss in chat

22 Sept 2011drilling progress report▼ Bad

Ungani-1 reached 3,593m total depth, but the drill string became stuck and parted at 2,216m during logging prep, preventing evaluation of a good-oil-shows zone (2,160-2,210m); the JV began weighing a sidetrack.

Value this in the calculator →Discuss in chat

15 Sept 2011drilling progress report▲ Good

Ungani-1 reached 3,355m in the Laurel Formation with background gas over 100 units and gas peaks (with minor fluorescence) at 2,580m and 2,700m, significance pending total depth and logging.

Value this in the calculator →Discuss in chat

8 Sept 2011drilling progress report▼ Bad

Ungani-1 was cased at 1,993m after logs indicated the earlier Grant/Anderson oil shows were residual (no moveable hydrocarbons); drilling continued into the tight Upper Laurel Formation (2,244m) with modest background gas.

Value this in the calculator →Discuss in chat

1 Sept 2011drilling progress report▲ GoodMajor

Ungani-1 reached its 1,997m section total depth in the top Laurel carbonates, with oil shows noted in both the Grant Sandstones (945-970m) and Anderson Formation (1,500-1,530m) - significance still to be determined.

Value this in the calculator →Discuss in chat

1 Sept 2011drilling progress report▲ GoodMajor

Pictor East-1 reached its 1,706m total depth; logs and pressure data confirmed a significant hydrocarbon column (~7m net porous section) in the Nita Formation, with composition (oil vs gas) pending lab analysis of pressurised samples.

Value this in the calculator →Discuss in chat

28 Aug 2011farm in farm out completion● Neutral

Green Rock Energy confirmed drilling had commenced to deepen the Lawford #1 well (EP417, operated by New Standard Energy) - Green Rock stood to earn a 15% interest in EP417 on completion of the drilling, with Buru operating the rig under its existing arrangement with New Standard.

Value this in the calculator →Discuss in chat

25 Aug 2011drilling progress report▲ Good

Pictor East-1 reached 1,075m after a fully-recovered core (899-917m); the Nita Formation was found close to prognosis with mudlog shows similar to the earlier Pictor-1 well.

Value this in the calculator →Discuss in chat

18 Aug 2011drilling progress report● Neutral

Pictor East-1 (spudded 9 August, second well of the 2011 Mitsubishi program) reached 709m, heading toward the Nita Formation that had tested oil and gas at nearby Pictor-1.

Value this in the calculator →Discuss in chat

18 Aug 2011drilling progress report● Neutral

Ungani-1 (spudded 13 August, third well of the 2011 Mitsubishi program) reached 622m, preparing to case ahead of drilling toward its Anderson Formation target.

Value this in the calculator →Discuss in chat

15 Aug 2011drilling spud▲ GoodMajor

Ungani-1 spudded at 16:00hrs on 13 August 2011, the third well of the 2011 Buru-Mitsubishi program (Mitsubishi carrying 80% of cost), targeting oil in the Grant/Anderson Formations and gas in the Laurel Formation near the Yulleroo Field - the well that would go on to deliver Buru's flagship Ungani oil discovery.

Value this in the calculator →Discuss in chat

10 Aug 2011drilling spud● Neutral

Pictor East-1 spudded at 19:00hrs on 9 August 2011, the second well of the 2011 Buru-Mitsubishi program (Mitsubishi carrying 80% of the well's cost), appraising a 1984 BHP discovery (Pictor-1) with P50 potential of up to 10 million barrels of recoverable oil.

Value this in the calculator →Discuss in chat