Each one in plain English, with the numbers worked through for a shareholder.
14 Apr 2025investor presentation▲ Good
Update on Minyari Dome pre-feasibility study: metallurgy, environmental, water and permitting work advanced, with debt advisers engaged. Drilling is scheduled from late April, with PFS-specific drilling in July. Cash is about A$40M (unaudited), which the company says funds these programmes.
IGO has withdrawn from the Paterson farm-in from 30 April 2025, so Antipa retains 100% of the 1,520km2 project, which surrounds Minyari Dome. IGO spent about A$15M. Antipa's wholly owned Paterson tenements total about 4,060km2, with an H1 CY2025 programme planned.
Amended version of the 9 April Paterson release, reissued at ASX's request. It updates the JORC table commentary, adds the competent person's consent and cross-references earlier results. The announcement's substance, including IGO's withdrawal, is unchanged.
Ignite Investment Summit Hong Kong presentation, March 2025. Visible text is only disclaimers referring to the 24 October 2024 Scoping Study, with assumptions stated as unchanged. No new figures visible.
Euroz Hartleys Institutional Investor Conference presentation, March 2025. Visible text is only disclaimers referring to the 24 October 2024 Scoping Study, with assumptions stated as unchanged. No new figures visible.
Half-year to 31 December 2024: net loss A$4.66M (A$1.30M loss a year earlier) and operating cash outflow A$4.91M including exploration. Recaps the 2.3Moz Minyari resource, the scoping study and the A$17M Citadel sale. Only the opening pages were visible.
Antipa confirms normal trading of consolidated shares starts 6 March 2025, with securities staying halted until then. First settlement of deferred and normal trades moves to 10 March 2025. Administrative timetable update.
ASX temporarily paused trading in Antipa securities pending a further announcement. No reason is given in the notice. The company's follow-up release the same day ties the timing to the consolidation.
Newmont has withdrawn from the Wilki farm-in, so Antipa keeps 100% of the 1,430km2 project and resumes management from 3 March 2025. Newmont pays about A$590,000. Parklands drilling of up to 16,000m is planned for H1 CY2025, funded by Antipa.
Appendix 3A.3 update confirming the 10-for-1 consolidation: notices to holders were dispatched a day early. Ordinary shares go from 4,853,912,493 to 555,546,680; the 23 Oct 2025 options go from 233,663,719 to 21,112,680. Administrative.
The 10-for-1 share and option consolidation approved on 21 February 2025 is complete. Shares on issue fall to 555,546,680 and holding statements have been sent. Normal trading of consolidated shares starts 6 March 2025.
RIU Explorers Conference presentation, February 2025. Visible text is only disclaimers referring to the 24 October Scoping Study update, with assumptions stated as unchanged. No new figures visible.
Third batch of 36 Phase 2 holes returns thick gold-copper intercepts at Minyari, best 51m at 2.7 g/t gold and 0.39% copper from 396m, plus 86m at 1.7 g/t. More near-surface gold at GEO-01 and Fiama; an advanced economic study is expected to begin shortly.
December quarter report: cash A$36.5M after the A$17M Citadel proceeds and A$16M placement. Restates the Scoping Study (pre-tax NPV7 A$834M), 2.3Moz resource and Phase 2 results from 35 holes. No new results.
Lion Selection Group says it is investing a further A$1.0M in Antipa's A$16M placement, taking its total investment to A$3.0M and its holding to about 4.4%. This confirms the placement support already announced by Antipa.
Formal notice of the proposed 10-for-1 consolidation of shares and options, subject to holder approval on 21 Feb 2025. Shares on issue would fall from 4,853,912,493 to about 485.4M. Trading in new shares starts 6 Mar 2025.
19 Dec 2024capital raising announcement▲ GoodMajor
Antipa raises A$16M via a placement of about 640M shares at A$0.025, a 19.4% discount to last close, to fund the Minyari PFS and DFS toward a final investment decision. A 10-for-1 share consolidation will go to a vote around 21 Feb 2025.
What it means for a shareholder
640m new shares at A$0.025 to raise about A$16.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Second batch of 23 Phase 2 holes at Minyari Dome finds new near-surface high-grade gold, best 17m at 6.8 g/t from 65m at Minyari South. GEO-01 South renamed Fiama (16m at 3.8 g/t). Results for 37 holes remain due early 2025.
Amended version of the same-day Telfer/Jezabeel release, reissued at ASX's request. It adds cross sections, drill hole 24PTDD004 in the results table and depth intervals for a core photo. No change to results.
A second large gold surface anomaly, Jezabeel (3km by up to 1.3km), is identified 4km northeast of Telfer at Wilki, funded by Newmont. At IGO's Paterson project, first seven diamond holes (2,608m) confirm copper, nickel and cobalt; key gravity targets remain untested.
Annual General Meeting presentation, November 2024. Visible text is only disclaimers referring to the 24 October Scoping Study update, with assumptions stated as unchanged. No new figures visible.
First Phase 2 assays (12 RC holes) found new shallow gold at GEO-01 South, best 23m at 2.8 g/t from 77m, with 8m at 7.7 g/t inside. Mineralisation remains open, supporting further resource growth at the 151koz GEO-01 deposit.
Noosa Mining Conference presentation, November 2024. Visible text is only disclaimers referring to the 24 October Scoping Study update, with assumptions unchanged. No new figures visible.
September quarter report restates the updated Scoping Study (pre-tax NPV7 A$834M, 52% IRR at A$3,000/oz), the 2.3Moz Minyari resource and Phase 1 results. Phase 2 drilling began after quarter end. No new results.
25 Oct 2024asset acquisition disposition▲ GoodMajor
Sale of Antipa's Citadel JV interest to Rio Tinto completed for A$17M cash, on the terms announced 13 September. Cash now above A$23M; Antipa keeps the Newmont and IGO farm-ins and focuses on Minyari Dome.
Updated Minyari Scoping Study (24 Oct 2024). Only the cautionary statement is visible; it says up to A$306M pre-production funding may be needed, possibly dilutive. Results figures are not in this text, but the 25 Oct release gives pre-tax NPV7 A$834M at A$3,000/oz gold.
Antipa retracts all peer-comparison slides (9, 13, 42-44) from its Scoping Study presentation and tells investors not to rely on them; an updated presentation is attached. Correction only, no change to study results.
Updated Scoping Study presentation, October 2024, headed 'exceptional stand-alone development potential confirmed'. Visible text is only disclaimers pointing to the 24 October release. It was later amended to retract peer comparisons.
Phase 2 drilling at Minyari Dome starts this week: 70 holes, up to 11,000m (66 RC, 4 diamond), aimed at growing GEO-01 and Minyari Southeast. First assays expected December; Citadel sale and Scoping Study update both due within weeks.
3 Oct 2024director officer appointment● NeutralMajor
Director Mark Rodda (on the board since 2010) becomes Executive Chair from 3 October 2024 on a A$300,000 base salary; Stephen Power stays as a non-executive director. Company links the change to rising Paterson Province activity.