Each one in plain English, with the numbers worked through for a shareholder.
12 Apr 2017farm in farm out completion▲ GoodMajor
Rio Tinto confirmed it will proceed to Stage 2 of the $60m Citadel farm-in, spending $8m over three years to earn 51%, and become operator. The $3m first stage is satisfied, resolving that open thread. Rio may withdraw in this stage after $2m spend.
ASX lifted the suspension of Antipa shares immediately after the Citadel farm-in announcement was released. Administrative notice only, no other substance.
Proposed Rio-funded 2017 Citadel programme: IP surveys at Blue Steel (~12 line-km) and the Calibre trend (~60 line-km), ~4,800m aircore at Rimfire, ~1,000 line-km airborne EM, then ~3,000m RC drilling. WA Government EIS grant covers up to $150,000.
Antipa asked ASX for a voluntary trading suspension pending an announcement about its Citadel farm-in with Rio Tinto, expected before trading on 12 April 2017. The text gives no detail on the content.
A 2017 Minyari Dome programme is planned: up to 9,000m of RC drilling from mid-April to June, mainly at WACA (up to 8,000m) and Minyari strike extensions. A Phase 2 follows in Q3, and a Scoping Study is targeted for Q4 2017.
Half-year report to 31 December 2016 shows a net loss of $1,229,637 (prior year $901,050) and operating cash outflow of $712,240. It recaps Minyari, Tim's Dome South and Citadel activity already announced. No new operating results visible.
All Minyari Dome Phase 2 results are in, including 92.85m at 1.17 g/t gold in diamond hole 16MYD0047 at Minyari. Metallurgical test-work has begun and an Exploration Target is planned, aiming at a Scoping Study. Remaining Citadel assays show further work needed on IP targets and Rimfire.
Quarterly report to 31 December 2016 recaps the completed Minyari and Citadel Phase 2 programmes, the WACA and Rimfire results, and the completed raising of about $7m. Operating cash outflow was $1.14m for the quarter. Nothing new beyond earlier announcements.
January 2017 company update. Visible text shows 1,173.3m shares, 96.1m unlisted options, no debt, and cash of $8.15m at 31 December 2016 (including $656k of Rio Tinto JV funds). Share price $0.018, market cap $21.1m. No new results visible.
Citadel Phase 2 drilling found a 4.8km copper trend at Rimfire, e.g. 23m at 0.12% copper. Blue Steel and Meekus drilling did not explain the IP anomalies, so follow-up is needed. Rio Tinto funds the programme; results for 10 holes are still pending.
First Minyari Phase 2 assays at WACA, 700m from Minyari, include 8.0m at 21.04 g/t gold (13.75 g/t cut) and 41.0m at 2.10 g/t gold. A high-grade gold zone is now shown to run about 300m vertically, extending earlier shallow drilling.
Antipa completed the October capital raising: $2m received from Sprott affiliates for 76.9m shares at $0.026, plus the remaining 807,691 share purchase plan shares. Total raised is about $7m, to fund exploration at North Telfer, including Minyari and WACA, plus working capital.
What it means for a shareholder
76.9m new shares at $0.026 to raise about $2.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Phase 2 programmes at North Telfer and Citadel are under way. At Citadel, four Blue Steel holes (905m) did not explain the IP anomaly, so a 600m Rio-funded diamond hole is added. Minyari Dome drilling continues, due to finish in December.
The share purchase plan drew applications for 53.7m shares at $0.026, totalling $1,396,300, short of the $2m maximum; 52.9m shares were issued. The Sprott $2m is expected later this week, taking the total raised to about $7m.
What it means for a shareholder
53.7m new shares at $0.026 to raise about $1.4m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Antipa issued 139,785,566 placement shares raising $3,634,425 before costs, the first part of the October placement. It pays a 6% fee and agreed to issue 12m options at $0.039 (4 years), subject to approval or capacity. Pre-placement holders are diluted by 8.7% under the 7.1A portion.
Quarterly report to 30 September 2016 recaps Minyari Phase 1 results, the Tim's Dome South data review, and the start of Phase 2 programmes at Citadel and Minyari. It also notes the $5.63m placement and $2m share purchase plan announced after quarter end.
Minyari Phase 2 began 30 October with a detailed IP survey, followed by up to 6,000m RC and 1,800m diamond drilling from early November. It aims to extend Minyari and WACA and begin metallurgical work and resource estimate preparation. Completion is planned for December.
Rio Tinto-funded Phase 2 RC drilling at Citadel began on 27 October, up to about 6,000m testing the 20km IP corridor. It is due to finish in December, with final assays within two months after. This starts the Q4 drilling previously flagged.
Offer document for the share purchase plan announced with the placement: eligible shareholders can buy up to $15,000 of shares at $0.026, with a cap of 76.9m shares. The offer closes 10 November 2016. Administrative follow-through, no new terms.
26 Oct 2016capital raising announcement▲ GoodMajor
Antipa launches a $5.63m placement of up to 216.7m shares at $0.026 (18.8% discount), including $2m from Sprott Group affiliates, plus a $2m share purchase plan at the same price. Funds go to North Telfer exploration and working capital.
What it means for a shareholder
217m new shares at $0.026 to raise about $5.6m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
October company update presentation. Visible text shows 902.8m shares, 96.1m unlisted options, no debt, and cash of $2.74m at 30 September (including $1.04m of Rio Tinto JV funds). Share price $0.034, market cap $30.7m. No new exploration results visible.
Rio Tinto-funded Phase 2 RC drilling at Citadel, up to about 6,000m and 30-40 holes, is planned from late October, finishing in December. It tests the 20km IP corridor including Blue Steel and Meekus. A $148,000 WA EIS grant supports Rimfire drilling.
Final Minyari Phase 1 assays (18 holes) include 69m at 4.07 g/t gold from 92m, and 7m at 7.59 g/t gold with 4.90% copper. Phase 1 objectives were met; Phase 2 drilling is planned before end of 2016, following the Phase 2 decision flagged earlier.
Review of historic data at the recently acquired Tim's Dome South, 12km along strike from Telfer, shows a gold vein corridor over 4km long and up to 200m wide, e.g. 22m at 2.63 g/t gold. Drilling is shallow, averaging 60m depth. No resource estimate is stated.
On AGM day the company says the guide exercise price for the director options being voted on would be $0.047, based on 1.5 times the five-day VWAP. Actual price is set at issue. This addresses the earlier open director-options thread.
Appendix 4G, a standard form confirming the corporate governance statement sits on pages 53-60 of the annual report, approved by the board as at 18 August 2016. No substantive new information.
Annual report for the year to 30 June 2016, including the directors' report, remuneration report and corporate governance statement. Visible text shows only board details; financial figures not visible.
Assays for 17 more Minyari holes show further high-grade gold, e.g. 23m at 3.16 g/t gold including 12m at 5.59 g/t. Mineralisation now confirmed over 250m strike and up to 200m down dip, still open. Remaining results delayed to second half of September.
Full-year statutory accounts for the year to 30 June 2016, lodged ahead of the annual report. Visible text shows only the directors' report and board details; financial figures not visible. No change to directors or BDO as auditor.