Each one in plain English, with the numbers worked through for a shareholder.
7 Aug 2017investor presentation● Neutral
August company update repeats known facts: Phase 1 drilling finished in July (~15,500m) and Phase 2 is under way. Shows cash A$6.1m at 30 June 2017, no debt, share price A$0.026, market cap A$30.5m. No new results.
Minyari drilling extends high-grade gold to over 400m of strike, with intercepts such as 34m at 3.02 g/t gold, 0.33% copper and 0.09% cobalt. Assays received for 59 holes, about 78%. Phase 2 drilling is expected this quarter.
2 Aug 2017asset acquisition disposition▲ GoodMajor
Antipa's application for exploration licence E45/4867 over the Chicken Ranch gold deposit succeeded. It lies 15km from Telfer and 25km from Minyari-WACA; historic drilling includes 16m at 6.6 g/t gold. No resource is stated; no price is shown in the text provided.
More Phase 1 drilling extends WACA high-grade gold to over 340 vertical metres depth along 450m of strike, with gold along 650m; best new hit 7m at 6.2 g/t. A Jude's hole found 26m at 0.53% copper. Assays now received for 47 holes, about 61%.
Noosa conference presentation repeats known facts, adding the WACA 42m at 7.79 g/t gold hole to the Minyari Dome slide. Cash still shown as A$7.13m (31 March), no debt, 1,173.3m shares, share price A$0.022. No new information.
Gold Coast showcase presentation repeats known facts: three projects, +4,400km2 in the Paterson Province, Rio Tinto's Stage 2 election and the Minyari/WACA focus. Corporate snapshot shows cash A$7.13m (31 March), no debt, share price A$0.022, market cap A$25.8m. No new results.
Antipa re-released the 21 June drilling announcement to correct an error in Figure 1. Hole 17MYC0078 is restated as 42.0m at 7.79 g/t gold, including 13.0m at 22.05 g/t. No new results.
Phase 1 Minyari Dome drilling hit high-grade gold at WACA, including 42m at 7.8 g/t gold with 13m at 22.1 g/t. Phase 1 is expanded from 9,000m to about 12,000m, with maiden resources planned within the Scoping Study by end-2017.
Antipa received a $124,000 R&D tax incentive cash rebate from the Australian Tax Office, based on eligible spending in the year to 30 June 2016. A small cash inflow.
Initial metallurgical tests on Minyari and WACA ore show average gold recovery of 95% for oxide and 88% for primary ore using conventional gravity and cyanide leaching. Flotation concentrates reached up to 158 g/t gold. This supports the planned Scoping Study.
June 2017 company update repeats known facts. It shows cash of $7.13m at 31 March 2017, no debt, 1,173.3m shares, 108.1m unlisted options and a $0.018 share price (market cap $21.1m). No new results visible.
Rio-funded Citadel Phase 1 started on 11 June with an IP survey over a 15km corridor, expected to take up to six weeks. Airborne EM is planned before end-June; aircore drilling follows, and Phase 2 RC drilling is due in Q3 2017.
Phase 1 of the 2017 Minyari Dome programme began on 12 April with drilling at Minyari: up to 9,000m of RC drilling at Minyari and WACA. This starts the programme announced on 27 March, aimed at reaching a Scoping Study.
Rio Tinto confirmed it will proceed to Stage 2 of the $60m Citadel farm-in, spending $8m over three years to earn 51%, and become operator. The $3m first stage is satisfied, resolving that open thread. Rio may withdraw in this stage after $2m spend.
ASX lifted the suspension of Antipa shares immediately after the Citadel farm-in announcement was released. Administrative notice only, no other substance.
Proposed Rio-funded 2017 Citadel programme: IP surveys at Blue Steel (~12 line-km) and the Calibre trend (~60 line-km), ~4,800m aircore at Rimfire, ~1,000 line-km airborne EM, then ~3,000m RC drilling. WA Government EIS grant covers up to $150,000.
Antipa asked ASX for a voluntary trading suspension pending an announcement about its Citadel farm-in with Rio Tinto, expected before trading on 12 April 2017. The text gives no detail on the content.
A 2017 Minyari Dome programme is planned: up to 9,000m of RC drilling from mid-April to June, mainly at WACA (up to 8,000m) and Minyari strike extensions. A Phase 2 follows in Q3, and a Scoping Study is targeted for Q4 2017.
Half-year report to 31 December 2016 shows a net loss of $1,229,637 (prior year $901,050) and operating cash outflow of $712,240. It recaps Minyari, Tim's Dome South and Citadel activity already announced. No new operating results visible.
All Minyari Dome Phase 2 results are in, including 92.85m at 1.17 g/t gold in diamond hole 16MYD0047 at Minyari. Metallurgical test-work has begun and an Exploration Target is planned, aiming at a Scoping Study. Remaining Citadel assays show further work needed on IP targets and Rimfire.
January 2017 company update. Visible text shows 1,173.3m shares, 96.1m unlisted options, no debt, and cash of $8.15m at 31 December 2016 (including $656k of Rio Tinto JV funds). Share price $0.018, market cap $21.1m. No new results visible.
Citadel Phase 2 drilling found a 4.8km copper trend at Rimfire, e.g. 23m at 0.12% copper. Blue Steel and Meekus drilling did not explain the IP anomalies, so follow-up is needed. Rio Tinto funds the programme; results for 10 holes are still pending.
First Minyari Phase 2 assays at WACA, 700m from Minyari, include 8.0m at 21.04 g/t gold (13.75 g/t cut) and 41.0m at 2.10 g/t gold. A high-grade gold zone is now shown to run about 300m vertically, extending earlier shallow drilling.
Antipa completed the October capital raising: $2m received from Sprott affiliates for 76.9m shares at $0.026, plus the remaining 807,691 share purchase plan shares. Total raised is about $7m, to fund exploration at North Telfer, including Minyari and WACA, plus working capital.
What it means for a shareholder
76.9m new shares at $0.026 to raise about $2.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Phase 2 programmes at North Telfer and Citadel are under way. At Citadel, four Blue Steel holes (905m) did not explain the IP anomaly, so a 600m Rio-funded diamond hole is added. Minyari Dome drilling continues, due to finish in December.
The share purchase plan drew applications for 53.7m shares at $0.026, totalling $1,396,300, short of the $2m maximum; 52.9m shares were issued. The Sprott $2m is expected later this week, taking the total raised to about $7m.
What it means for a shareholder
53.7m new shares at $0.026 to raise about $1.4m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Antipa issued 139,785,566 placement shares raising $3,634,425 before costs, the first part of the October placement. It pays a 6% fee and agreed to issue 12m options at $0.039 (4 years), subject to approval or capacity. Pre-placement holders are diluted by 8.7% under the 7.1A portion.
Minyari Phase 2 began 30 October with a detailed IP survey, followed by up to 6,000m RC and 1,800m diamond drilling from early November. It aims to extend Minyari and WACA and begin metallurgical work and resource estimate preparation. Completion is planned for December.
Rio Tinto-funded Phase 2 RC drilling at Citadel began on 27 October, up to about 6,000m testing the 20km IP corridor. It is due to finish in December, with final assays within two months after. This starts the Q4 drilling previously flagged.