20 Mar 2019investor presentation● Neutral
Corporate presentation for the Hong Kong 121 Conference, March 2019; visible text is disclaimers only. No new results or figures visible.
Each one in plain English, with the numbers worked through for a shareholder.
20 Mar 2019investor presentation● Neutral
Corporate presentation for the Hong Kong 121 Conference, March 2019; visible text is disclaimers only. No new results or figures visible.
11 Mar 2019half year report● Neutral
Half-year to 31 December 2018: net loss $835,953 (prior year $916,402) and operating cash outflow $696,347. Board unchanged, BDO auditor. Recaps AEM and aeromagnetic results; no new developments in the text shown.
19 Feb 2019investor presentation● Neutral
RIU Explorers Conference presentation; visible text is disclaimers only. No new results or figures visible.
18 Feb 2019drilling scheduled▲ GoodMajor
Antipa will start a roughly 20,000m air core and RC programme in early April 2019 on its 100%-owned ground, testing up to 25 geophysical targets plus Turkey Farm. It also aims for maiden Chicken Ranch and Tim's Dome resources.
14 Feb 2019drilling result▲ Good
The 260km2 aeromagnetic survey identified several Havieron-lookalike anomalies, four high-priority (AZY-Mag01 to 04, 10-40km from Minyari-WACA), and refined targets 8km north of Rio's Winu discovery. Drilling of AEM targets is on track for early April 2019.
31 Jan 2019quarterly activities report● Neutral
December 2018 quarterly report recaps the AEM and aeromagnetic surveys, final Tim's Dome and Chicken Ranch results, Triangle/Pajero targets and Rio's Citadel work. Drilling of AEM targets planned for Q1 2019. Financial figures not visible in the text shown.
11 Dec 2018joint venture update● Neutral
Rio Tinto finished its 2018 Citadel work: 12 RC holes (2,052m) and a 600km2 AEM survey. GT1 (3 holes) gave anomalous copper, gold, tungsten and zinc for follow-up; Folly and MB1 need none. Calibre review found extension targets; AEM results pending.
11 Dec 2018drilling result▲ GoodMajor
Tim's Dome RC returned 64m at 0.58 g/t gold and 8m at 1.81 g/t; Chicken Ranch 6m at 3.88 g/t. New Triangle and Pajero brownfield targets identified. Resource update targeted late Q1 2019; greenfield drilling planned March 2019. IP targets at Tim's Dome did not hit significant mineralisation.
10 Dec 2018drilling scheduled▲ Good
Antipa added a 260km2 aeromagnetic survey, begun 8 December, to hunt Havieron-style targets near Rio Tinto's camp. A heritage survey is done on the first AEM targets, with drilling expected in the first quarter of 2019.
20 Nov 2018joint venture update▲ Good
Rio Tinto began an extra 600km2 airborne electromagnetic survey at Citadel, not in its original budget, to generate targets for 2019 drilling. Rio is still in the $8m stage for 51% of the $60m farm-in and funds all work.
15 Nov 2018drilling result▲ GoodMajor
Final Chicken Ranch results include 13m at 1.43 g/t gold and 3m at 4.05 g/t, with mineralisation still open. Antipa targets a maiden Chicken Ranch resource in the first quarter of 2019; Minyari North and Gonzo show new, preliminary zones.
5 Nov 2018price query● Neutral
ASX queried a rise in the share price from $0.015 to $0.021 on heavy volume. Antipa said it knew of no undisclosed information, pointing to media coverage of Rio Tinto's Paterson activity and its 5,500km2 holding.
31 Oct 2018quarterly activities report● Neutral
Quarterly report for September 2018, recapping Minyari South, Judes and Chicken Ranch results, metallurgy and the AEM targets. Tim's Dome RC drilling has started and Rio's Citadel drilling is complete, with results pending. Financial figures not visible in the text shown.
23 Oct 2018investor presentation● Neutral
Corporate presentation for the Hong Kong 121 Conference; visible text is disclaimers and the usual description of the Paterson Province projects (5,500km2 holding). No new results or figures visible.
15 Oct 2018drilling result▲ GoodMajor
Aerial electromagnetic survey over 1,020km2 near Minyari identified 11 high-priority conductor targets, nine within 7-45km of the Minyari-WACA resource, which could indicate gold or copper sulphides. This follows the survey begun in July; drilling is being planned.
2 Oct 2018drilling result▲ GoodMajor
RC drilling at Judes, 2km north of the 723koz Minyari resource, hit 45m at 0.56% copper from 72m, including 10m at 2.05% copper. Strike is 150m and open, a new copper zone alongside Minyari South. 18 of 45 holes' assays still pending.
19 Sept 2018drilling result▲ GoodMajor
First Chicken Ranch aircore results from the 2018 programme include 12m at 7.21g/t gold from 28m, with high-grade gold across 1.3km and potentially open. RC drilling of 16 holes is complete with results pending; 60 aircore holes still await assays. Chicken Ranch lies 25km south of the Minyari resource.
19 Sept 2018admin correction● Neutral
Corporate governance checklist lodged with the FY2018 annual report, pointing to the governance statement on pages 66-75 of the report. Administrative filing; no new results or financial figures.
19 Sept 2018annual report● Neutral
Annual report for the year to 30 June 2018. Visible text covers the corporate directory and director biographies; the board is unchanged (Power, Mason, Rodda, Buck, Johnson) with BDO as auditor. Financial figures are not in the text shown.
18 Sept 2018drilling progress report▲ Good
An IP survey at Tim's Dome identified eleven drill targets, the largest about 1,000m x 350m under shallow sand cover, comparable to Telfer's larger reefs. RC drilling of up to 7,000m began 17 September; no drill results yet.
4 Sept 2018joint venture update● Neutral
Rio Tinto began a drill programme of up to 3,050m at Citadel, testing copper-gold targets including Folly, GT1 and MB1, while it keeps reviewing Magnum Dome. Rio remains in year two of the $8m stage for 51%; it may withdraw after each annual programme.
27 Aug 2018other▲ Good
New metallurgical tests on Minyari ores show potential for copper-gold and cobalt-gold concentrates (copper up to 21.9%, cobalt up to 11%), adding to 2017 gold recoveries of 95% oxide and 88% primary. Company says this supports its development strategy; further optimisation work is planned.
15 Aug 2018investor presentation● Neutral
August update on the 2018-19 exploration programme, focused on the 100%-owned Minyari Dome, Chicken Ranch and Tim's Dome, all within 40km of Telfer. Visible text is mostly disclaimers and programme outline; no new results or figures shown.
6 Aug 2018investor presentation● Neutral
Presentation for the Diggers and Dealers Conference; text shown is mostly disclaimers and the same investment proposition as earlier 2018 decks (+5,800km2 in the Paterson Province). No new results or figures visible.
6 Aug 2018investor presentation● Neutral
Revised version of the Diggers and Dealers presentation released the same day; text shown is mostly disclaimers and the same content as the earlier version. No new figures visible.
1 Aug 2018drilling result▲ GoodMajor
First 2018 RC assay at Minyari South, 300m from the 723koz resource: 18m at 3.05g/t gold, 0.32% copper, 0.05% cobalt from 47m, including 6m at 6.59g/t. Only one hole reported; strike, dip and true thickness remain uncertain, so follow-up drilling is planned.
31 July 2018quarterly activities report● Neutral
Quarterly report for the June 2018 quarter: the 50,000m programme began in late June, and the $7.6m raising is said to fully fund the next 12 months of planned exploration. The AEM survey and Chicken Ranch aircore began after quarter end. Resource unchanged at 723koz.
18 July 2018investor presentation● Neutral
Presentation for the Noosa Mining and Exploration Conference; text shown is mostly disclaimers and the same investment proposition as earlier 2018 decks. No new results or figures visible.
16 July 2018drilling progress report▲ Good
Aircore drilling at Chicken Ranch (up to 12,000m) started three weeks early, and the large aerial electromagnetic survey of the El Paso Corridor began on schedule. RC drilling continues at Minyari Dome; an IP survey at Tim's Dome East is planned for late July. No results yet.
13 July 2018price query● Neutral
ASX queried a rise in Antipa's share price from 1.3 to 1.5 cents on heavy volume. Antipa said it knew of no undisclosed information, pointing to the recent $7.6m raising and the exploration campaign. It confirmed compliance with listing rules.